News and Tribune

Recent Local News

November 27, 2012

Engineering contract on water project approved by Sellersburg council

Sellersburg votes to redistrict

SELLERSBURG — The Sellersburg Town Council took a step toward beginning its water improvement project, but took no action on setting water rates for the town’s residents.

A contract with Curry and Associates was unanimously approved to complete the engineering work for the water improvement projects slated to be part of a series of projects to rehabilitate the town’s water system through a $5 million bond being sought.

The bond will pay for the drilling of two new supply wells, construction of a new booster station, a new 500,000-gallon water storage tank and to refurbish two of the town’s existing water tanks.

The amount of the contract, which will be paid out of the already approved Bond Anticipation Note, totaled $275,000.

“Once this is approved the first thing that’s going to be accomplished, I believe, will be addressing the [existing] water tanks.” said Town Council President Paul Rhodes.

He said he didn’t anticipate the rehabilitation and painting of the water tanks to begin until March.

As the town moved forward with the first step in rehabilitating its water system, no official action has been taken on increasing the town’s water rates to pay for the $5 million bond.

“We want to be sure we’ve got our questions answered, and that once we make a decision, it’s the right decision for the town,” Rhodes said.

The council said some questions were unanswered following a presentation by Indianapolis-based Umbaugh and Associates. The presentation offered two plans to the town to cover the bond being sought. The first option would raise monthly rates for town residents to $26.24, compared to $13.25 based on 5,000 gallons of water usage and the second alternative, the rate would increase by 104 percent, to $27 per 5,000 gallons of water usage.

Rhodes said the major difference in the two options is a $58,400 payment in lieu of taxes in the second alternative, as well as minor differences in the public fire protection surcharge.

Town Councilman Michael Lockhart said the questions included whether or not the increase in rates included fire protection costs and how the rates compared to other municipalities. He said Monday that fire protection costs were not included in the rate increases returned by Umbaugh.

According to Umbaugh’s draft rate study, the hydrant charge — per equivalent meter size — in alternative one totals $5.22 per month, or in alternative two $5.37 per month.

Text Only | Photo Reprints
Recent Local News
LOCAL MAGAZINES
Easter 2014 photos


Click on any photo to purchase it.

SPECIAL CONTENT
Twitter Updates
Follow us on twitter
Hyperlocal Search
Premier Guide
Find a business

Walking Fingers
Maps, Menus, Store hours, Coupons, and more...
Premier Guide
AP Video
SKorea Ferry Toll Hits 156, Search Gets Tougher Video Shows Possible Syrian Gas Attack Cubs Superfans Celebrate Wrigley's 100th Raw: Cattle Truck Overturns in Texas Admirers Flock to Dole During Kansas Homecoming Raw: Erupting Volcanoes in Guatemala and Peru Alibaba IPO Could Be Largest Ever for Tech Firm FBI Joining Probe of Suburban NY 'Swatting' Call U.S. Paratroopers in Poland, Amid Ukraine Crisis US Reviews Clemency for Certain Inmates Raw: Violence Erupts in Rio Near Olympic Venue Raw: Deadly Bombing in Egypt Raw: What's Inside a Commercial Jet Wheel Well Raw: Obama Arrives in Japan for State Visit Raw: Anti-Obama Activists Fight Manila Police Motels Near Disney Fighting Homeless Problem Michigan Man Sees Thanks to 'bionic Eye' S.C. Man Apologizes for Naked Walk in Wal-Mart Chief Mate: Crew Told to Escape After Passengers
2013 Photos of the year


Take a look at our most memorable photos from 2013.